
- Brief geological characteristics, local infrastructure and state of deposit exploration
- Brief general description of the extraction technology and processing of ores
- Preparatory investment and payback of the Project
List of work performed and basic design documentation
- «Results of ground geophysical studies in order to substantiate promising areas for the establishment of prospecting and exploratory wells to study the hydrogeological conditions of the Nosachev apatite and ilmenite ore deposit», Belaya Tserkov, 2003, SE «Artezian».
- «Scoping study of the feasibility of the development of the Nosachev apatite and ilmenite ore deposit», Cherkassy, 2003, Subsidiary enterprise «Tsentrukrukgeologiya» NJSC «Nedra Ukrainy».
- «Compilation of a volumetric geological and geophysical model of the Nosachev deposit», Kiev, 2003, JSC «Promstroydetal».
- «Integrated gas-hydrometric and thermometric studies in order to substantiate promising areas for the placement of prospecting and exploratory wells to study the hydrogeological conditions of the Nosachev apatite and ilmenite ore deposit located in the Smelyansky district of the Cherkassy region», Kiev, 2003, Laboratory of geological – hydrological and geoecological studies, IGS NAS Ukraine.
- Technical report on the preliminary study of the engineering and geological conditions of the industrial site for the preparation of the feasibility study «Uncovering and development of the Nosachev apatite and ilmenite deposit» 2004, Kiev, «UkrNIIproekt».
- Feasibility study of investments for the uncovering, development of reserves and industrial development of apatite and ilmenite ores of the Nosachev deposit. Justification of the location of construction objects. Dnepropetrovsk, 2004, JSC «Dneprogiproshakht».
- «Calculation of expected displacements and surface deformations from underground operations at Nosachev apatite and ilmenite deposit», Krivoy Rog, 2004, State Research Mining Institute (GNIGRI).
- Report on research work «Substantiation of mining technology and parameters of mining at the Nosachev deposit, ensuring the safety of undermined objects according to the category of their protection», Kryvyi Rih, 2004, GNIGRI.
- «Scheme of external power supply of Nosachev GOK», Kiev, 2004, Research Institute «Ukrelectrosetproekt».
- «Initial data for the implementation of the technical and economic assessment of the development of the Nosachev deposit», Zaporozhye, 2004, Institute of Titanium «NNIITitan».
- «Conclusion on the suitability of samples of ilmenite concentrate from the Nosachev deposit for the production of pigment titanium dioxide», Sumy, 2004, GosNII MINDIP.
- «Expert opinion on the work of the Kryvyi Rih State Scientific Research Institute of Geological Research» Calculation of the expected displacements and deformations of the earth’s surface from underground operations at the Nosachevsky apatite-ilmenite deposit «, Donetsk, 2005, «UkrNDMI».
- Report on the topic «Conducting research on the use of apatite concentrates from the Nosachev deposit in the production of mineral fertilizers», Sumy, 2005, GosNII MINDIP.
- Scientific and technical report on the topic «Determine the possibility of using VNGS wet tailings for obtaining stowing binders», Kharkov, 2005, State Research Institute «UKRDITSEMENT».
- Report on the work on the topic «Study of the possibility of using the tailings of the ilmenite ore processing of the Nosachev deposit in the national economy», Kharkov, 2005, NTU «KhPI»
- «Feasibility study of conditions for calculating the reserves of ilmenite ores of the Nosachev deposit», Krivoy Rog, 2005, «Kribassproekt» (approved by the State Commission of Ukraine on Mineral Reserves. Protocol of the meeting of the State Commission of Ukraine on Mineral Reserves dated 23.02.2006 No.1078).
- Calculation of the reserves of ores and minerals of the Nosachev deposit and approval of their quantity in the State Commission of Ukraine on Mineral Reserves (Protocol of the meeting of the Commission dated 13.04.2006, No. 1107).
- «Report on the exploration of solid minerals. Drilling exploration of the Nosachev apatite and ilmenite deposit for 2002 – 2006 », Cherkassy, 2007, SE «Tsentrukrgeologiya» NJSC «Nedra Ukrainy».
- «Proposals for the uncovering and development of a deposit using self-propelled equipment», Ust-Kamenogorsk, 2006, the Kazakhstan head institute for the design of non-ferrous metallurgy enterprises «KAZGIPROTSVETMET»
- «Urban planning feasibility study for «Uncovering, development of reserves and commercial development of apatite and ilmenite ores of the Nosachev deposit «, Cherkassy, 2007, PE «TECHNOSTROYPROEKT»..
- Final report «Pilot tests on apatite and ilmenite ore», Sala, Sweden, 2008, Metso Minerals (this report reflects the final technological scheme of the deposit’s ore processing, the design of the processing plant and the list of necessary technological equipment, as well as the cost of the plant).
- «Feasibility study of the rational choice of schemes for uncovering the Nosachev deposit of apatite and ilmenite ores», Krivoy Rog, 2008, «Krivbassproekt». Expert opinion «On the study of processed production waste («wet tailings» – plagioclase product of the Nosachev deposit), presented by LLC «TioFab, LTD» (Cherkassy), for their use as an aluminum-containing raw material in the glass industry», Konstantinovka, 2009, State Enterprise «UkrNIIStekla».
- Geological audit of the estimated mineral reserves of the Nosachev deposit «Modeling and assessment of the resources of the Nosachev apatite and ilmenite deposit», Australia, 2010 -2011, Micromine.
- Lease agreement for a land plot with an area of 48 hectares to locate an industrial site for the construction of a mining and processing plant on the basis of the Nosachev apatite and ilmenite ore deposit, Smela, 2011.